GN32 Energy Prediction and Post Occupancy Assessment

Latest version: v1.2, November 2021

The purpose of Guidance Note 32 is to describe the energy performance prediction and subsequent post occupancy monitoring methodology. This Guidance Note relates specifically to the Prediction of operational energy consumption criteria (4 credits) and the Post-occupancy stage criteria (2 exemplary credits) within BREEAM New Construction 2018.

Download Guidance Note 32

View all Guidance Notes (licensed assessors only)