LZC technologies – planning conditions and restrictions

Where a mandatory planning condition exists (eg to attach to a District Heating Scheme), this will clearly affect the number of options availableĀ in a feasibility study. In such cases, compliance can still be achieved where evidence on theĀ planning condition restrictionsĀ isĀ provided, and it is clarified how this excludes other technologies from being considered.

The feasibility study will still need to be carried out to cover the remaining energy needs of the building (eg Electrical and lighting load in the case of a district heating scheme).