Demonstrating CO2 reduction with no existing building information Created: 14th Nov 2016 Reference: KBCN0575
Feasibility study – comparison with connection to existing LZCs Created: 08th Nov 2016 Reference: KBCN0563
LZC technologies – energy centre or other LZCs connected at a later stage Created: 06th Jun 2016 Reference: KBCN0267