New Construction / International / 2013 /
00 General
Information correct as of 21stDecember 2024. Please see kb.breeam.com for the latest compliance information.
Approved Standards and Weightings List (ASWL) – Guidance on completing the ASWL where new standards are/are not being proposed - KBCN1669
- No new standards proposed: If you are not proposing any new standards/tools for use in your assessment, it is not necessary to submit an ASWL to the technical team at BRE Global for approval.
- New standards proposed: Only when new standards are being proposed does the ASWL need to be submitted to the BREEAM Technical Team via the ‘Assessor Queries’ section on BREEAM Projects. Please see details about how to do this in the KBCN0762 ASWL submission protocol – Knowledge Base (breeam.com).
- Completed ASWL: A project-specific ASWL must be submitted with all International Refurbishment and Fit Out and International New Construction assessments. The ASWL needs to include any recently approved standards that are not listed in columns N (International or European Standard reference) or Q (Approved National Best Practice Standard / Tool Reference / Weighting) of the country specific sheet or in the new country sheet (if a country sheet does not exist for the country the project is in). Rows in the ASWL are not required to be completed when an issue is not targeted/not applicable or if pre-approved standards are used on the assessment. If the assessment is selected for a Quality Assurance audit and any unapproved standards/tools are included in the ASWL, these will be given non-conformances. Please note: An ASWL always needs to be submitted with your assessment even if no new standards are being proposed and only pre-approved standards are being used. Where this is the case, a blank ASWL should be included within the assessment so the QA auditor knows which version of the ASWL has been used.
- Using columns T and V: The standards/tools proposed for technical approval should be stated in column T (Proposed National Best Practice Standard/Tool Reference) of the country specific sheet or in the new country sheet (if a country sheet does not exist for the country the project is in). Column V (Assessor Comments) does not need to be filled out; this can be used when a standard/tool is submitted for approval to the technical team.
- Referencing standards in an assessment: Within the Assessor’s commentary section in an assessment, clear referencing should be present in line with KBCN0522 Getting the referencing right – Knowledge Base (breeam.com) indicating where the standard has been included in the evidence within individual applicable issues. If a QA Auditor cannot confirm which standard has been used and that the used standard is approved, this can result in a non-conformance.
- Correct ASWL versions: Please use the correct version of the ASWL in accordance with: KBCN0910 Version of ASWL that should be submitted to QA – Knowledge Base (breeam.com).
ASWL – submission timescales - KBCN0425
If no new standards are being proposed for use on a project, it is not necessary to submit an Approved Standards and Weightings List (ASWL) to BRE Global for approval. Please note that a completed list must always be submitted as part of the report submission to the Quality Assurance (QA) team.
Where new standards are being proposed for use, the ASWL should be submitted to the BREEAM technical team at least 3 months prior to the submission of the assessment for QA. Those received at the same time as the report may result in a delay to the QA process.
BRE Global aims to review new standards within four weeks, however this may be exceeded in cases where further investigation into the applicability of proposed new standards is required. BRE Global will keep the assessor updated of the status of the review in these instances.
ASWL in Interim and Final assessment stages - KBCN0427
Provided that the same standards are used at both Interim Design Stage and Final Post-construction Stage, it is not necessary to resubmit the Approved Standards and Weightings List at the Final Post-construction Stage.
ASWL location weightings - KBCN0436
As the BREEAM International schemes (New Construction 2013, New Construction 2016, and Refurbishment and Fit-Out (RFO) 2015) allow for the assessment of buildings across the world, the environmental weightings for projects are set per country, or per region if the country has significant land mass with varying climates/ environmental issues. These are listed in the Approved Standards and Weightings List (ASWL). The online tool selects the relevant weightings based on the country selected in the Assessment details tab for International New Construction 2016 and International RFO 2015. Details of newly confirmed country weightings are released periodically in an updated ASWL.
If weightings have not been set for a country, it is because BRE Global does not have sufficient data to determine the appropriate weightings yet. As the scoring cannot be confirmed, it is not possible to submit the assessment for certification until weightings have been set. Therefore we ask assessors to complete, with the help of a local expert if necessary, and submit the BREEAM International Weightings Form, available from BREEAM Projects>Documents and Tools. BRE Global will then review and confirm the weightings for the country or region. Please make sure to complete and submit the BREEAM International Weightings Form related to the scheme under which the assessed project has been registered.
Please note that this automatic selection of weightings is not in place for International New Construction 2013 and 2009 versions.
ASWL submission protocol - KBCN0762
Where a new standard is being proposed the ASWL should be submitted to BRE for approval in advance of any subsequent assessment certification submission to QA.
When submitting 'local' codes and standards to BRE Global for approval, licensed assessors must include the following information:
- BRE Global assessment registration number, name of the assessment and BREEAM scheme.
- A completed copy of the Approved Standards and Weightings List. Please refer to KBCN0910 to determine which version of the ASWL should be used.
- A full reference for each proposed code or standard, including publication dates and version numbers.
- Any relevant comments on the suitability of each proposed code or standard.
- The relevant information from each proposed code or standard in the local language demonstrating that the general principles outlined in 'BRE G checks on standards' of the Approved Standards and Weightings List have been met.
- Translation of the relevant information from each proposed code or standard in compliance with the BRE Global translation requirements.
- A letter from the translator confirming that they are an Appropriate Translator, counter-signed by the licensed assessor.
- Any previous communication with BRE Global regarding the nominated codes or standards.
Where a project is using previously approved standards only, the assessor only needs to submit the ASWL to QA and not prior to this for approval.
Compliance: Applicability of criteria to subsequent schemes’ versions - KBCN0554
When assessing a project under a certain scheme, criteria or compliance notes from a previous scheme cannot be used to demonstrate compliance.
Compliance: Applicability of criteria to scheme’s previous versions - KBCN0430
Criteria set for a scheme version are not applicable retrospectively to previous versions.
Compliance: Manufacturer/supplier does not comply - KBCN0571
Where equipment is required to meet specific criteria to achieve compliance it is important to ensure the client seeks out manufacturers/suppliers that provide equipment which meets these criteria. If the chosen product / supplier cannot meet the criteria then the credit cannot be awarded.
BREEAM seeks to recognise the use of equipment which offers the latest sustainable solutions.
Compliance: Statutory requirements - KBCN0395
BREEAM is an assessment method which promotes best practice in sustainable buildings.
Matters critical to health and safety, as well as any mandatory requirements from statutory authorities which conflict with BREEAM criteria may take precedence over BREEAM requirements. In this instance, evidence would be required to demonstrate that this is the case.
Note, this does not change the criteria requirements, and where BREEAM requirements are not met the design team must explore alternative options or specifications if the relevant credits are to be awarded.
17/04/18 Wording amended to clarify
Definition of NIA (net floor area) for assessment registration purposes - KBCN0569
Net Internal Area (NIA) is broadly the usable area within a building measured to the face of the internal finish of perimeter or party walls ignoring skirting boards and taking each floor into account.
NIA will include:
- Perimeter skirting, moulding, or trunking
- Kitchens
- Any built in units or cupboards occupying useable areas (subject to height exclusion below)
- Partition walls or similar dividing elements
- Open circulation areas and entrance halls, corridors and atria (but see 9 and 10 below)
NIA will exclude:
- Toilets and associated lobbies
- Cleaners' cupboards
- Lift rooms, boiler rooms, tank rooms, fuel stores and plant rooms other than those of a trade process nature
- Stairwells, lift wells, those parts of entrance halls, atria, landings and balconies used in common or for the purpose of essential access
- Corridors and other circulation areas where used in common with other occupiers or of a permanent essential nature
- Areas under the control of service or other external authorities
- Internal structural walls, walls (whether structural or not) enclosing excluded areas, columns, piers, chimney breasts, other projections, vertical ducts etc
- The space occupied by permanent air conditioning, heating or cooling apparatus and ducting which renders the space substantially unusable having regard to the purpose for which it is intended
- Areas with headroom of less than 1.5m
- Car parking areas
Source: Valuation Office Agency
Therefore, the usable area within a building measured to the face of the internal walls should be provided.
Whilst this is not expected to be accurate to the nearest 1m
2, the closest estimate possible for the NFA should be entered. This is to allow for any possible subsequent adjustment to the size of the development.
Evidence: Final design/’as-built’ drawings as evidence - KBCN0393
Where drawings are not clearly marked to indicate their 'as-built' status, additional evidence would need to be provided by the design team to confirm the drawings represent the completed development and that there have been no changes relevant to the BREEAM/HQM assessment. This could, for example, be a written confirmation from the architect or the contractor, as appropriate.
Evidence: Post construction assessment evidence - KBCN0407
For the purposes of robustness and completeness, both design AND post-construction stage evidence is required for a post construction assessment. However, it is possible to provide only post construction stage (PCS) evidence where it is clear that this completely supersedes the design stage (DS) evidence and renders it unnecessary.
Fit-out level – Selecting the appropriate assessment type - KBCN1627
Projects designed and constructed as fully fitted should not be evaluated as ‘Shell and core’ or ‘Shell-only’ where the intent is to limit the scope of the BREEAM assessment without further justification.
Where the fit-out level of a project is not consistent, the BREEAM assessment type should be considered in line with
KBCN0702
Fully-fitted assessments with shell & core areas – 75% GLA guidance - KBCN0379
Where a single assessment of a fully-fitted development, with a small proportion of shell and core has been permitted, the guidance relating to 75% of the floor area being covered by a GLA (see Appendix D) must be 75% of the shell & core area, excluding the fully-fitted area.
13/01/2017 - Re-formatted and amended for clarity.
GN10 Assessing mixed use developments and multiple buildings (or units) of similar function - KBCN0623
Summary
The purpose of this Guidance Note is to assist BREEAM assessors with scheme classifications and the application of BREEAM for mixed use developments and developments with multiple buildings or units on the same site.
Note: This guidance note has been revised to v1.0 April 2018
View full Guidance Note (licensed assessors only)
View all Guidance Notes (licensed assessors only)
17/04/18 Wording clarified
04/06/18 Note added regarding revision and hyperlink updated
Green Lease Agreement – reference to the technical manual - KBCN0881
The technical manual includes criteria, intended for the guidance and interpretation of licensed BREEAM assessors. It does not generally provide detailed practical solutions to meet the criteria.
In the BREEAM UK New Construction 2011 and International New Construction 2013 schemes, Shell only/Shell & core assessments included provision for demonstrating compliance for fit-out items using a Green Lease Agreement (GLA).
The future tenant and their design team should not have to rely on a licensed BREEAM assessor to assist them in interpreting the GLA to achieve a compliant fit-out. Specifications for achieving compliance must therefore be explicitly included within the GLA, with reference to the relevant BREEAM criteria, to allow the fit-out team to understand exactly what is required.
A compliant Green Lease Agreement must be a robust alternative to the actual implementation or installation of fit-out measures. A Green Lease Agreement which relies solely on reference to the BREEAM Technical manual is not considered a robust solution.
Green Lease Agreement: an alternative to - KBCN0378
A legally binding lease agreement between the developer and tenant which requires tenants to use a fit-out guide with mandatory BREEAM requirements can be considered a Green Lease Agreement.
Green Lease Agreements refer to the mandatory BREEAM requirements. If the fit-out guide refers to non-mandatory BREEAM requirements, this can be considered a Green Building Guide.
Green lease agreements – developments with multiple tenants - KBCN0411
The 75% rule only applies to the floor areas of the building which are subject to a Green Lease Agreement. Areas of the building which are fully fitted or subject to any of the other shell and core options cannot contribute towards this rule.
Laboratory containment level category definitions - KBCN0943
BRE does not designate or define containment levels for laboratories. The categories listed in the manuals are based on industry standard definitions.
For further information, please refer to HSE/COSHH or DEFRA definitions, depending upon the hazard type.
Master plans with multiple stakeholders - KBCN0953
Assessment of a building forming part of a master plan co-ordinated by a third party (developer or local authority)
In such cases, it may not be possible for the design team to control elements affecting issues such as land use and ecology, access, external lighting and surface water pollution.
It is therefore acceptable for the assessor to define the assessment boundary according to one of two following options:
- Restrict the boundary only to what the design team can control.
- Extend the boundary to include elements of the master plan, assessing any associated benefits or disadvantages that arise. Relevant Knowledge Base Compliance Notes should be reviewed, and BREEAM Technical contacted for additional guidance if required.
The assessment boundary must remain consistent throughout all issues. Facilities outside of the boundary but serving the assessment (i.e. cycle facilities, parking etc) can be assessed as standard.
Assessment of a building forming part of a master plan co-ordinated by the design team with third party elements
Where there are third party elements in the master plan which are not BREEAM compliant (e.g. external lighting by local authority), evidence should be submitted to QA that efforts have been made with the third party to align these elements with BREEAM criteria.
Where this is not possible, these elements can be excluded. Full justification should be provided when submitting the assessment for certification.
Part Shell and Core Part Fully Fitted assessment - KBCN0426
This CN has been suspended and is currently undergoing technical review.
Principal contractor or subcontractor no longer operational - KBCN0590
In situations where the principal contractor or other company involved in the project is no longer operational where, for example, the company has gone into administration, the assessor may be unable to obtain all the evidence to meet the requirements of BREEAM or HQM.
For some BREEAM Issues, it may not be possible to demonstrate compliance retrospectively, and in such cases, the relevant credits must be withheld.
However, in this situation, a lack of complete evidence will not, in itself, prevent the project from achieving a BREEAM rating and, where relevant, a prerequisite or minimum standard can be waived. For example:
UK NC V6 Man 03 Prerequisite - Legally harvested and traded timber
or
INC V6 Wst 03a – 1 credit to achieve an Excellent Rating
This is based on the project team demonstrating appropriate efforts to obtain the evidence from the company in administration and providing the following:
- Evidence of the company going into administration
- Evidence of compliance from the company in administration, where available
- Evidence of compliance from the date a new company was engaged
28 Oct 2024 - Title and general approach updated. Applied to HQM One/V6 and NC V6.
Process Notes - KBCN0611
Process notes can be accessed by licensed assessors
here.
When a new process note has been released, you may be required to tick the box to confirm you have read the note to be able to access other documents in BREEAM Projects. To do this scroll to the bottom of the Process Note index page and tick the box and click next.
Process: Registration date and applicable scheme manual issue - KBCN0708
Typically the scheme technical manual issue which is current when a project is registered should be used for the assessment. For example, if a BREEAM UK New Construction 2014 development was registered on 01/07/2016, the current issue of the scheme technical manual at that point would be issue 4.1, which was published on 11/03/2016 (the next issue 5.0 of the technical manual was published on 05/09/2016). However, it is permissible for the assessor to decide to use a later issue of the technical manual. The scheme technical manual version and issue used for the assessment should be clearly referenced within the assessment report.
Note that in any case, the same technical manual version and issue should be used for the entire assessment. It is not acceptable to assess different credits based on different issues of the technical manual and it is not acceptable to change issues between submissions of the assessment.
26 09 17 Clarification added that the 'Issue' of the technical manual may not be changed between assessment submissions
Schedule of changes in the technical manual - KBCN0870
For Issue 1.1 of this scheme, this can be found in Appendix H.
Scheme classification – Education - KBCN0398
The Education scheme classification criteria is tailored to the requirements of buildings that are likely to be used by large numbers of students, whose requirements differ slightly from the general population. Where a building on an education campus, or owned by an educational institution:
- is not used for teaching / study
- is primarily used by staff or other non-students
- and transport requirements differ from a standard Education building
The building may be assessed under a different, more appropriate scheme classification. Where it is unclear how this building should be assessed, a scheme classification query should be submitted.
Scheme classification based on anticipated occupancy & building use - KBCN0421
In the instance where there is potential for the building occupancy and use to change during the building lifetime, scheme classification should be based on the most likely occupancy and use of the building as anticipated at the time of the assessment.
Please refer to Guidance Note 10 (GN10) for further details
Scheme classification queries - KBCN0540
As the Operational Guidance clarifies ‘…A scheme classification requires the assessor, client or design team to submit floor plans showing the layout of the building(s) along with its intended functional areas and any other relevant information. BRE Global will then confirm the appropriate means of assessing the development, using either one or more standard schemes or by developing project-specific bespoke criteria…’
BREEAM Technical cannot definitively confirm a scheme classification in the absence of drawings.
Relevant information could also include specification of the scope of works, clarification of general building functions, spaces within them, as well as their management and access to the public.
Shell & core options where tenants become known before final certification - KBCN0858
In such situations the route to demonstrating compliance may change from that at design stage certification. The following approaches to some possible scenarios should be followed:
- Where tenants become known and a Green Building Guide (Option 2) is supported by the tenants' own compliant fit-out specification, full credits can be awarded on the basis of Option 3.
- Where tenants become known and the developer has fulfilled their obligation in producing a compliant Green Building Guide (Option 2) at the appropriate time and provided this to the prospective tenant, half credits can be awarded regardless of whether the tenant follows the guide.
- If the tenants become known and a Green Lease Agreement (Option 1) will not be signed and complied with in full, the GLA is no longer valid. Where relevant, a revised GLA document must be produced, signed and enforced for credits to be awarded.
No recognition can be given for any Issues in the original GLA which will not be complied with as the superseded GLA cannot be retrospectively considered as a Green Building Guide.
Shell & core project: Completing as fully-fitted - KBCN0394
It is possible to complete an assessment as fully fitted following a design stage certification as a shell & core project. Whilst the assessment will reference much of the same evidence gathered for design stage, it must be re-registered and may be submitted as a fully-fitted Post-construction assessment.
17/04/18 Wording clarified
Shell and Core – Green Lease Agreements – 75% rule - KBCN0392
The 75% rule, referred to in Appendix D Option 1, only applies to the floor areas of the building which are subject to a Green Lease Agreement. Areas which are fully fitted or subject to either of the other shell and core options cannot contribute towards this.
Shell and Core Options – Change option between Design Stage and Post Construction - KBCN0595
It is acceptable for the Shell and Core option to change between Design Stage and Post Construction Review. For example, Option 1 (Green Lease Agreement) could be used to award credits in the Design Stage assessment. As a project progresses, if a tenant was found, Option 3 (Tenant collaboration) could then be used to award credits in the Post Construction stage assessment.
Shell and core/speculative assessments for residential - KBCN0923
The shell only options are not applicable to Residential buildings. This has been made clear in the scoring and reporting tool.
Shell only/shell and core assessments and applicability of minimum standards - KBCN0612
For BREEAM Issues where the Minimum Standard refers to work which falls outside the scope of a shell only/shell and core assessment, as noted in the technical manual, the Minimum Standard is not applicable.
This affords shell only/shell and core projects the potential to achieve their target BREEAM ratings.
Time critical requirements – Concept / Technical Design stages - KBCN1711
The intent of the criteria relating to project stages in BREEAM is to ensure that actions are taken at a time when they can have the intended influence.
Where projects are following these defined stages via a traditional procurement route, referring to the project programme and work stages are a robust and convenient way to demonstrate that the intent is met.
However, not all projects will follow these work stages. In such cases, the project can show that the intent is met by demonstrating that, for the relevant BREEAM requirement, the activity has happened when the project is at an appropriate stage of development.
Concept Design
The project stage at which fundamental aspects of the design are developed.
- What has happened already: the architectural concept is established.
- What is in progress: the design is undergoing spatial coordination and design development for detailed planning approval.
- Detailed planning approval is an approval that covers all major aspects of the asset's external appearance and form. Typically this means the detailed massing, external materials, and site layout are confirmed.
- Achieving outline planning permission does not mean that the project has left Concept Design. An outline approval is an approval for architectural concept but with many of the above details still missing, and yet to be developed.
Technical Design
Once a detailed planning application has been submitted, many aspects of the design will be fixed, and the project is at Technical Design stage.
- What has happened already: full planning approval has been granted.
- What is in progress: detailed spatial coordination and developed design information is being used to develop the information needed to construct the asset.
Depending on the procurement route, there may be an overlap between technical design and the construction phase of the works.
Additional guidance
Sometimes different aspects of the design might be at different project stages.
KBCN1156 gives detailed guidance on how to define the project stage for each construction element, based on the design information available for that element. Although it was originally written specifically to address Mat 01 LCA for UK NC 2018 and V6, it may be useful in other situations.
Time critical requirements – defining project stage by construction element - KBCN1156
This KBCN was originally written to specifically clarify BREEAM requirements for Mat 01 Concept / Technical Design under NC 2018 and V6. However, the general principles may also be applicable to other assessment issues.
As a building design process passes through successive work stages, increasingly more aspects of the design become fixed. BREEAM criteria often require actions at, before or after specific project work stages, as these are the optimal stages to achieve the required sustainability outcome. When undertaken at a different stage, the criteria may be difficult to comply with, opportunities may be missed, options limited or costs may become prohibitive.
Knowing which stage your project is at
Where possible, BREEAM refers to industry-standard work stages, for example the RIBA plan of work stages. However different project teams can interpret these referenced stages differently.
Furthermore, many projects do not follow these stages in a simple linear fashion for all aspects of the design at the same time. For instance, the envelope design may be well advanced even to the point where installation has commenced before any specification decisions have been made on some interior finishes. As such, a project may not be at one project stage for all elements of the design at any one point in time.
This Knowledge Base compliance note is intended to provide supplementary information to enable projects to determine what stage they are at with respect to time critical BREEAM requirements, including where different elements are at different stages. Although project team members may be willing to offer their opinion on the stage the project has reached, this will often be subjective and hence inconsistent. Therefore, the process set out here looks at the currently available design information for the project (e.g. drawings, specifications) to determine the current work stage in relation to the issue under consideration. This provides a more objective, demonstrable approach for the assessor to follow.
Concept Design Stage
The RIBA definition of ‘Concept Design’ (RIBA stage 2) can be found here
https://www.ribaplanofwork.com/PlanOfWork.aspx . The core objective given is
‘Prepare Concept Design, including outline proposals for structural design, building services systems, outline specifications and preliminary Cost Information along with relevant Project Strategies in accordance with Design Programme. Agree alterations to brief and issue Final Project Brief.’
Table 1 and table 2 (in the link below) provide further guidance, specific to BREEAM, to help determine whether a project, or part of the project relevant to the issue/credit, is at ‘Concept Design’ stage. If there is ambiguity or uncertainty about the stage of the project, the assessor should check with the design team whether the design documentation (drawings, specifications, BIM etc.)
currently being produced by the design team will generally include the information listed.
It is possible for different aspects of the project to be at different stages in terms of how progressed the design is. For example, the substructure design may be at technical design or even installed while the internal partitions are still at concept design. Whether this matters depends on the issue/credit being pursued. The following steps take this into account.
Step 1
First, for the issue/credit being pursued, determine which of the relevant assessment scope items in table 1 and 2 are relevant. For example, if the issue/credit only relates to substructure, then only the substructure assessment scope items shall be considered. If the issue/credit is of a general nature concerning the whole project, then all the assessment scope items shall be considered.
Step 2
For the relevant assessment scope items from step 1, decide which of the following applies the most: -
- Where the items listed are in the process of being included in the design documentation, this indicates that the project, or part of the project being considered, is likely to be at the ‘Concept Design’ stage.
- If items listed are not in the process of being included, the project, or part of the project being considered, is likely to be at an earlier stage.
- If the existing design documentation already includes the items listed the project, or part of the project being considered, is likely to be at a later stage.
Please note that the items listed are indicative of the typical information produced at ‘Concept Design’ stage.
Technical Design Stage
The RIBA definition of ‘Technical Design’ (RIBA stage 4) can be found here https://www.ribaplanofwork.com/PlanOfWork.aspx . The core objective provided is ‘
Prepare Technical Design in accordance with Design Responsibility Matrix and Project Strategies to include all architectural, structural and building services information, specialist subcontractor design and specifications, in accordance with Design Programme.’
The following provides further guidance, specific to BREEAM, to determine whether a project is at the ‘Technical Design’ stage: The RIBA plan of work definition of ‘Technical Design’ clearly states that it should ‘
…include all architectural, structural and building services information, specialist subcontractor design and specifications…’. Therefore, it is a simpler task to determine whether the project, or part of the project relevant to the issue/credit, is at this stage. If there is ambiguity or uncertainty about the stage of the project, the assessor should check with the design team whether the design documentation (drawings, specifications, BIM etc.) currently under production by the design team (and the contractor’s specialist sub-contractors, if applicable) will, when finished, generally include all the final design information required for the construction works on-site.
Like concept design, it is possible for different aspects of the project to be at different stages in terms of how progressed the design is. The following steps take this into account.
Step 1
First, for the issue/credit being pursued, determine which of the relevant assessment scope items are relevant (the assessment scope items given in table 1 and 2 may be used, but the rest of the information in these tables relates to concept design).
Step 2
For the relevant assessment scope items from step 1, decide which of the following applies the most: -
- Where all the final design information required for the construction works on-site is in the process of being included in the design documentation, this indicates that the project, or part of the project being considered, is likely to be at the ‘Technical Design’ stage.
- If it is not in the process of being included, the project, or part of the project being considered, is likely to be at an earlier stage.
- If the existing design documentation already includes all the final design information required for the construction works on-site the project, or part of the project being considered, is likely to be at a later stage.
KBCN1156_IndicatorTables
06-Nov-2024 - Scheme applicability updated. Title amended. Explanatory note added.
17-Jun-2019 - KBCN updated to provide additional guidance.
Tools: Tracker+ - KBCN0760
Please note that Tracker+ is not a BRE-owned or managed reporting tool. For issues concerning Tracker + please contact the provider (Southfacing) as the BRE cannot advise on technical issues relating to Tracker+.
Tools: Use of reissued tools - KBCN0384
The most up-to-date version of an excel tool should be downloaded from the BREEAM Assessor's Extranet when a new assessment is started. If an updated tool is subsequently released then it will not be necessary to use the updated tool instead of the version already being used. The assessor can choose to use the updated tool if they wish.
When new tool versions are released, assessors are notified through the monthly Process Note. We would expect Assessors to review the 'Schedule of Changes' tab when an updated tool is released. If fundamental changes have been made to the tool and they will affect the results for the issue in question please contact BRE for guidance.
Translation of standards for approval - KBCN0435
BRE Global can translate standards for the Approved Standards and Weightings List submission.
Please contact BRE Global in advance of submitting the Approved Standards and Weightings List, so that a proposal to cover the translation work can be arranged.
Version of ASWL that should be submitted to QA - KBCN0910
The version of the ASWL that should be submitted is the one that was current at the time of registration or a later version, but not an older version. The following dates were taken from the appropriate Process Note. For post construction assessment, the registration date at design stage of the project should be considered
- version 42.0 August 2024
- version 41.0 February 2024
- version 40.0 January 2024
- version 39.0 September 2023
- version 38.0 June 2023
- version 37.0 November 2022
- version 36.0 September 2021
- version 35.0 August 2021
- version 34.0 May 2020
- version 33.0 December 2019
- version 32.1 April 2019
- version 32 February 2019
- version 31.1 October 2018
- version 30 November 2017
- version 29 November 2016
- version 28 March 2016
- version 27 February 2015
- version 26 November 2014
- version 25 July 2014
- version 24 June 2014
- version 23 June 2013
- version 22.1 December 2012
- version 21 September 2012
Please always indicate the version of the ASWL that has been submitted to QA, either in the name of the document or in the report.
Please note the upload dates within BREEAM Projects (stated underneath each ASWL file) may be different to the dates above. Please ensure the dates above are always used.
[Withdrawn] – multiple assessments – site-wide certificate - KBCN0874
Where developments on a site are assessed under multiple BREEAM registrations, but there is a requirement for an overall, site-wide BREEAM rating, an additional certificate can be produced for the whole development.
For further details of this service and applicable fees, please contact the BREEAM technical team.
04-Dec-2023 - Withdrawn.
17-Apr-2018 - Amended to clarify.
Information correct as of 21stDecember 2024. Please see kb.breeam.com for the latest compliance information.