Evidence for ’04 Detailed monitoring and reporting’ at design stage

The evidence requirements associated with ‘04 Detailed monitoring and reporting’ for Design Stage in both the ‘Construction Water and Energy Use’ are incorrectly formatted and should appear in the Post-Construction Stage column.

For design stage evidence requirements, please refer to

KBCN1231 ‘Design Stage evidence requirements when a contractor has not been appointed’