For the purposes of BREEAM, Issue Ene 01 should be assessed using a BRUKL output based on the prevalent UK country Building regulations applicable to that scheme.
This applies even when the building does not need to undertake energy modelling to comply with Building Regulations.
Where a different analysis is required for statutory compliance, due to the location of the project or registration to an earlier or later version of Part L, a different output must be produced for this purpose.
Alternatively, where applicable, the BREEAM registration could be updated to the latest version, so the same energy model output can be used for both purposes.
To maintain consistency and comparability for all assessments registered to a scheme.
24/08/2022 Applicability to UKNC V6 confirmed