BRUKL File Upload – HVAC Area Mismatch in UK New Construction V6.1 Created: 16th May 2025 Reference: KBCN1734
Calculating EPR where there are multiple BRUKL/NCM outputs Created: 20th Sep 2023 Reference: KBCN1618
Credit requirement for an “Excellent” or “Outstanding” – Connection to district heating is a condition of Planning Created: 29th Jul 2025 Reference: KBCN1766
Energy consumption and carbon emissions of untreated spaces Created: 06th Jun 2016 Reference: KBCN00049
Energy modelling not required for Building Regulations compliance Created: 26th Sep 2016 Reference: KBCN0487
Energy performance assessment for part of a whole building Created: 14th Nov 2016 Reference: KBCN0596
GN39 Ene 01 Calculation Methodology – BREEAM UK NC 2018, V6.0, and V6.1 Created: 16th Apr 2018 Reference: KBCN1098
LZC technologies – energy centre or other LZCs connected at a later stage Created: 06th Jun 2016 Reference: KBCN0267
Parts of the building not subject to national thermal regulations Created: 25th Oct 2016 Reference: KBCN0534
Prediction of operational energy consumption – Multiple (similar) buildings assessments Created: 18th Oct 2021 Reference: KBCN1479
Prediction of operational energy consumption – alternative route to Excellent minimum standard Created: 17th May 2019 Reference: KBCN1336
Prediction of operational energy consumption – passive design analysis Created: 23rd Feb 2024 Reference: KBCN1647
Registering assessments to UK NC2018 or UK NC V6 – Version of Part L Created: 13th Sep 2022 Reference: KBCN1535
Shell only – Alternative route to meeting the Minimum Standard for BREEAM Excellent Created: 10th Jun 2026 Reference: KBCN1880
Statutory requirements for energy modelling differ from BREEAM Created: 06th Jun 2016 Reference: KBCN0127
Use of as-designed BRUKL output for post-construction submission Created: 01st Aug 2017 Reference: KBCN0889