[KBCN withdrawn] ~ Shell and core applicability

Please substitute the following text for compliance note CN1 of Hea 02 International New Construction 2016 manual:

Shell and Core (non-residential and residential institutions only)

Pre-requisite: criterion 1

Both options: All criteria relevant to the building type and function apply.

Indoor air quality: criterion 2

Both options: This criterion is not applicable.

Ventilation: criteria 3 to 8

Shell only: These criteria are not applicable.

Shell and core: Criteria 4 and 5 are applicable.

Emissions levels: criteria 9 to 17 and 20 to 23 

Both options: These criteria are not applicable.

Adaptability – Potential for natural ventilation: criteria 18 to 19

Both options: All criteria relevant to the building type and function apply.

Refer to Appendix D – Shell and core project assessments for a more detailed description of the shell and core assessment options.

22-Oct-2022 KBCN withdrawn - manual has been updated.