Feasibility study – comparison with connection to existing LZCs Created: 08/11/2016 / Reference: KBCN0563
LZC technologies – energy centre or other LZCs connected at a later stage Created: 06/06/2016 / Reference: KBCN0267
Modelling basecase for Low/Zero carbon technology – efficiency of gas boiler Created: 06/06/2016 / Reference: KBCN0297
Passive design analysis – Modelling the standard building when existing building elements are retained Created: 25/03/2019 / Reference: KBCN1270