Demonstrating CO2 reduction with no existing building information Created: 14th Nov 2016 Reference: KBCN0575
Feasibility study – comparison with connection to existing LZCs Created: 08th Nov 2016 Reference: KBCN0563
LZC technologies – energy centre or other LZCs connected at a later stage Created: 06th Jun 2016 Reference: KBCN0267
Passive design analysis – Error in the Methodology section Created: 07th Mar 2019 Reference: KBCN1260
Quantifying the reduced total energy demand and CO2 emissions resulting from passive design measures Created: 05th Jul 2024 Reference: KBCN1677